Great post. I think a huge number of points were also put into the 10 seconds directly after liftoff.
I.e, if the ship is going to fly, ensure it doesn't need termination in range of the tower. Anything to ensure the next test article in the pipe can be ready to fly in minimum time.
I.e, if the ship is going to fly, ensure it doesn't need termination in range of the tower. Anything to ensure the next test article in the pipe can be ready to fly in minimum time.