"The issue with CLT as a building system is exactly that -- its behavior as a whole when subjected to differing forces as statistically magnified by the great number of joints. There are a ton of connections in a CLT building. Thousands of them. One connection failure can create a cascade of failure that may destroy the building. Each connection has the fingerprints of a single worker. One bonehead can wreck a connection."
That's a non-negligible practical problem and a perfectly valid point.
And it's difficult to take the residential approach of "just over-spec" when you're building mid-rise+.
That's a non-negligible practical problem and a perfectly valid point.
And it's difficult to take the residential approach of "just over-spec" when you're building mid-rise+.